STABILIS ENERGY LNG PRODUCTION


Stabilis is a Leader in Operating Small-Scale LNG Liquefaction Facilities.

Stabilis Energy owns and operates a 100,000 gallon per day liquefier in with 270,000 gallons of LNG storage located in George West, TX in the heart of the EagleFord shale basin. It has a dual truck rack for fast and easy loading of LNG to tanker trucks. Since 2015, it has been successfully operating and serving the industrial, mining, E&P and other various markets in the Southwest US and Mexico with clean and environmentally friendly LNG. Construction was completed on-time and on-budget. Over 500 design changes were implemented to increase production and reliability. Production of 100,000 LNG-gpd exceeds nameplate capacity due to Stabilis design improvements. 99% uptime exceeds design specifications due to Stabilis operating and maintenance procedures.

 
Image